Consulting and Services for Business Costumers – Planning & Installation

We will make your company’s charging solution a reality

With Elli at your side, you can implement the charging solution perfectly tailored to your location. And if the complexity of your project calls for advance planning stages, you can also count on us.

Planning and installation of charging infrastructure

The result of a site analysis decides whether planning is required. This may depend on whether a building permit or further detailed plans are needed such as structural analysis to assess how the charging infrastructure can be installed. In a planning project, all trades needed for the installation are integrated into detailed technical plans.

The outcome of the planning process is a charging infrastructure mapped out in every detail, including the required documents and permits as well as an installation offer.

In case of smaller projects (e.g. a small number of charge points; no planning for civil works), separate project planning can be dispensed with if all critical issues can be fully resolved in the site analysis.

If necessary, the transformer equipment and the primary and sub-distribution set-up can be adapted to the requirements of the future charging infrastructure. In addition, cable runs, excavations and foundations are prepared, cables are laid and the charging equipment is installed and commissioned.


Small projects – no planning phase

If the site analysis indicates a low-complexity project, you can move forward to the construction and installation stages relatively quickly.

Our services in the installation phase

Order finalisation meeting

for final confirmation that both parties understand all aspects of the project

Review

of possible need for advance planning

Procurement of all materials

Construction launch meeting onsite

to clarify the course of construction and any special considerations with the customer

Construction work

of the ordered services and commissioning of the charge points

Your result

  • Installation and commissioning of charge points and completion of all additional services

  • Handover of charge points including commissioning documentation, orientation

Larger projects with planning phase

Complex projects require thorough planning with clearly defined intermediate steps. This is the case, for example, with more than approx. 10 AC charge points / civil works / transformer replacement / DC charging. This is assessed during the site analysis.

Our services in the planning phase

Order finalisation meeting

for comparison of the planning with the existing local conditions

Obtaining the required documents

such as permits, cable location data and site plans

Assessment of the grid connection conditions

with the grid operator

Preparation of planning documents (e.g. site plans) and definition of the necessary construction measures

Compilation of an individual list of services and a construction schedule

The planning process does not include tax or legal advice.

Your result

  • Planning documents (site map with concept drawing, ground plans).

  • Follow-up enquiry to grid operator, including result of grid operator’s assessment.

  • Obtaining required official approvals (building permit, unexploded ordnance inspection, environmental review).

  • Binding offer for installation.

Our services in the installation phase

Designated contact person

during the entire construction project

Communications with building authority and grid operator

Procurement of all materials

by Elli

Implementation

of all commissioned construction work 

Commissioning and integration

into Elli backend as well as seamless transition to operation of facility through Elli

Acceptance of construction work;

clarification of residual work

Your result

  • Installation and commissioning of charge points and completion of all additional services

  • Complete documentation of the installation project and as-built site map and ground plan

  • Handover of charging station including orientation

Next steps

For ordering please contact your Elli contact person or use our online contact form.

Contact us online

To help us process your enquiry efficiently, we kindly request some information on your project.

1.

Which charging options do you have now or plan to implement in the future?

1/4

Additional services

Site analysis

We will work with you to complete an onsite assessment of the structural and technical conditions for your future charging location and assess the conditions for the further project phases. This yields a solid, practice-oriented foundation for decisions on the further implementation of your charging infrastructure.

Connecting the charge points

Are you already operating a charging site? Would you like to manage it through the Elli backend system? Perhaps you are also looking to expand your charging capacity without having to replace your current charging hardware? In either case, Elli is there for you.

CPO Services

Elli offers the full range of services for the operation and maintenance of your company’s charging infrastructure. Along with scheduled maintenance, this may include – depending on your needs – phone support, remote diagnostics, onsite service and repairs.  It’s up to you whether you wish to have all services delivered by a single provider or prefer to select individual services.