Planning and installation of charging infrastructure
The result of a site analysis decides whether planning is required. This may depend on whether a building permit or further detailed plans are needed such as structural analysis to assess how the charging infrastructure can be installed. In a planning project, all trades needed for the installation are integrated into detailed technical plans.

The outcome of the planning process is a charging infrastructure mapped out in every detail, including the required documents and permits as well as an installation offer.
In case of smaller projects (e.g. a small number of charge points; no planning for civil works), separate project planning can be dispensed with if all critical issues can be fully resolved in the site analysis.
If necessary, the transformer equipment and the primary and sub-distribution set-up can be adapted to the requirements of the future charging infrastructure. In addition, cable runs, excavations and foundations are prepared, cables are laid and the charging equipment is installed and commissioned.

Small projects – no planning phase
If the site analysis indicates a low-complexity project, you can move forward to the construction and installation stages relatively quickly.
Our services in the installation phase
Order finalisation meeting
for final confirmation that both parties understand all aspects of the project
Review
of possible need for advance planning
Procurement of all materials
Construction launch meeting onsite
to clarify the course of construction and any special considerations with the customer
Construction work
of the ordered services and commissioning of the charge points
Your result
Installation and commissioning of charge points and completion of all additional services
Handover of charge points including commissioning documentation, orientation

Larger projects with planning phase
Complex projects require thorough planning with clearly defined intermediate steps. This is the case, for example, with more than approx. 10 AC charge points / civil works / transformer replacement / DC charging. This is assessed during the site analysis.
Our services in the planning phase
Order finalisation meeting
for comparison of the planning with the existing local conditions
Obtaining the required documents
such as permits, cable location data and site plans
Assessment of the grid connection conditions
with the grid operator
Preparation of planning documents (e.g. site plans) and definition of the necessary construction measures
Compilation of an individual list of services and a construction schedule
The planning process does not include tax or legal advice.
Your result
Planning documents (site map with concept drawing, ground plans).
Follow-up enquiry to grid operator, including result of grid operator’s assessment.
Obtaining required official approvals (building permit, unexploded ordnance inspection, environmental review).
Binding offer for installation.
Our services in the installation phase
Designated contact person
during the entire construction project
Communications with building authority and grid operator
Procurement of all materials
by Elli
Implementation
of all commissioned construction work
Commissioning and integration
into Elli backend as well as seamless transition to operation of facility through Elli
Acceptance of construction work;
clarification of residual work
Your result
Installation and commissioning of charge points and completion of all additional services
Complete documentation of the installation project and as-built site map and ground plan
Handover of charging station including orientation
Next steps
For ordering please contact your Elli contact person or use our online contact form.
Additional services
We will work with you to complete an onsite assessment of the structural and technical conditions for your future charging location and assess the conditions for the further project phases. This yields a solid, practice-oriented foundation for decisions on the further implementation of your charging infrastructure.
Are you already operating a charging site? Would you like to manage it through the Elli backend system? Perhaps you are also looking to expand your charging capacity without having to replace your current charging hardware? In either case, Elli is there for you.
Elli offers the full range of services for the operation and maintenance of your company’s charging infrastructure. Along with scheduled maintenance, this may include – depending on your needs – phone support, remote diagnostics, onsite service and repairs. It’s up to you whether you wish to have all services delivered by a single provider or prefer to select individual services.